Short Lead Time for Scaffold Eye Bolt - Hex Bolt /din933/din 931/gb/t5783/5782 – Duojia Detail:
Product Description
Place of origin | Yongnian, Hebei, China |
Processing services | molding, cutting |
Application | Sealed |
Size | Customized size |
Usage example | Free |
Color | various, according to customization |
Material | plastic, metal |
Color | can be customized according to needs |
Production basis | existing drawings or samples |
Delivery time | 10-25 working days |
Applications | automotive, machinery and equipment, construction, etc |
Packing | carton + bubble film |
Mode of transportation | sea, air, etc |
Product details
size | standard | M6 | M8 | M10 | M12 | M14 | M16 | M18 | M20 | M22 | M24 | M27 | M30 |
S | GB30 | 10 | 14 | 17 | 19 | 22 | 24 | 27 | 30 | 32 | 36 | 41 | 46 |
GB1228 | 21 | 27 | 34 | 36 | 41 | 46 | 50 | ||||||
GB5782/5783 | 10 | 13 | 16 | 18 | 21 | 24 | 27 | 30 | 34 | 36 | 41 | 46 | |
DIN931/933 | 10 | 13 | 17 | 19 | 22 | 24 | 27 | 30 | 32 | 36 | 41 | 46 | |
K | GB30 | 4 | 5.5 | 7 | 8 | 9 | 10 | 12 | 13 | 14 | 15 | 17 | 19 |
GB1228 | 7.5 | 10 | 12.5 | 14 | 15 | 17 | 18.7 | ||||||
GB5782/5783 | 4 | 5.3 | 6.4 | 7.5 | 8.8 | 10 | 11.5 | 12.5 | 14 | 15 | 17 | 18.7 | |
DIN931/933 | 4 | 5.3 | 6.4 | 7.5 | 8.8 | 10 | 11.5 | 12.5 | 14 | 15 | 17 | 18.4 |
Remarks
1. GB5782 refers to half teeth; GB5783 refers to the whole tooth, and the technical size of the head is the same
2. DIN931 refers to half teeth; DIN933 refers to all teeth, and the technical size of the head is the same
3. GB1228 refers to the large hexagonal head bolt for steel structure
4. GB30 commonly known as the old national standard; GB5782/5783 is commonly known as the new national standard
FAQ
Q: What is Your Main Pro Ducts?
A: Our Main Products Are Fasteners: Bolts, Screws, Rods, Nuts, Washers, Anchors and Rivets.meantime, Our Company Also Produces Stamping Parts and Machined Parts.
Q: How to Ensure That Every Process’s Quality
A: Every Process Will Be Checked by Our Quality Inspection Department Which Insures Every Product’s Quality.
In The Production of Products, We Will Personally Go to the Factory To Check the Quality of Products.
Q: How Long is Your Delivery Time?
A: Our Delivery Time is Generally 30 to 45 Days. or According to the Quantity.
Q: What is Your Payment Method?
A: 30% Value of T/t in Advance and Other 70% Balance on B/l Copy.
For Small Order Less Than1000usd, Would Suggest You Pay 100% In Advance to Reduce the Bank Charges.
Q: Can You Provide a Sample?
A: Sure, Our Sample is Provided Free of Charge, but Not Including Courier Fees.
delivery
Payment and Shipping
surface treatment
Certificate
factory
Product detail pictures:
Related Product Guide:
Our products are widely recognized and trusted by users and can meet continuously changing economic and social needs of Short Lead Time for Scaffold Eye Bolt - Hex Bolt /din933/din 931/gb/t5783/5782 – Duojia, The product will supply to all over the world, such as: Southampton, Brunei, Cape Town, we rely on own advantages to build a mutual-benefit commerce mechanism with our cooperative partners. As a result, we have gained a global sales network reaching the Middle East, Turkey, Malaysia and Vietnamese.
By Mabel from Bulgaria - 2018.09.21 11:01
Good quality, reasonable prices, rich variety and perfect after-sales service, it's nice!
By Gill from Azerbaijan - 2018.12.22 12:52